Cool - thanks.
Cheers.
Cool - thanks.
Cheers.
I standardize all times for sake of consistency, both chemically and in relation to rote methodology, lest I forget (2 min for both Dev and Blix @ 83F, stop and rinses are briefer, final wash considerably longer). Times shorter than that risk too much of the interlude being allotted to fill and drain of the drum, even though my drums fill and drain far quicker than a Jobo drum, for example. I've never gotten acceptably predictable results the "room temp" method.
Bookmarks