    Hi all, does anyone have a plumbing plan setup for a jobo cpp3 ? Thanks

  2. #2

    Join Date
    Dec 2014
    Location
    Iowa City, Iowa
    Posts
    1,703

    Re: Plumbing for jobo cpp3

    Quote Originally Posted by Dean Wilmot View Post
    Hi all, does anyone have a plumbing plan setup for a jobo cpp3 ? Thanks
    Hi, the CPP 2 and 3 have a solenoid inlet valve for cold water. This will maintain sub ambient temperature. Assuming you have cold tap water. Where I live the incoming water is rarely above 10C.
    There's a overflow provision as well that allows your processor to drain if the trough is overfilled, for instance if the cold water valve opens to cool your processor. If you don't have cold tap water and a warm darkroom is a problem. You can either turn on the ac and let the whole thing cool down or invest in a chiller. Plastic ice packs work as well.

    I have thermostatic mixing valves, so I can fill my processors with water at correct temperature, and have plenty of wash water.

    Also be careful filling the processor with really hot water. There's a thermal breaker switch that trips around 50C.

  3. #3

    Join Date
    Dec 2014
    Location
    Iowa City, Iowa
    Posts
    1,703

    Re: Plumbing for jobo cpp3

    I set mine in a 8 foot darkroom sink. After each use I drain and wipe dry.

  4. #4
    bob carnie's Avatar
    Join Date
    Jan 2004
    Location
    Toronto, Ontario,
    Posts
    4,943

    Re: Plumbing for jobo cpp3

    I just use a hose to fill the tanks and I do not hook up plumbing to my Cpp3, I only use it as a manual unit.

  5. #5

    Join Date
    Dec 2014
    Location
    Iowa City, Iowa
    Posts
    1,703

    Re: Plumbing for jobo cpp3

    Quote Originally Posted by bob carnie View Post
    I just use a hose to fill the tanks and I do not hook up plumbing to my Cpp3, I only use it as a manual unit.
    This is how I do it with my 20+ year old CPP2. I've been telling myself for the last couple years that I deserve a new processor. Hmmn.

  6. #6

    Join Date
    Oct 2015
    Posts
    1,581

    Re: Plumbing for jobo cpp3

    Quote Originally Posted by Duolab123 View Post
    This is how I do it with my 20+ year old CPP2. I've been telling myself for the last couple years that I deserve a new processor. Hmmn.
    Same here; though I've never told myself I need a new one!

  7. #7

    Join Date
    Sep 2018
    Location
    North Narrabeen NSW Australia
    Posts
    55

    Re: Plumbing for jobo cpp3

    Thanks all. I too have a 8 foot darkroom sink and plan to setup the same way. I invested in a HASS TMV 20 years ago and its been in storage and still works so initially was thinking to also run the water in at 20 degrees C but the plumbing and space is bit tight, might need to reconsider this option. In Sydney the water temp gets to 25 degrees in summer so a chiller is also a consideration to plumb in (I used ice blocks when I had the CPE3 and it was a pain in the rear) , yet another expense on an already ridiculously expensive CPP3, UGHH. Is it worth having the TMV set at 20 degrees connected to the solenoid inlet valve on the processor or is it better to use straight cold water ?? I initially thought having the correct 20 degree temp coming in would be ideal?? Ive been told the unit is still 6-8 weeks away but want to make sure all the work is completed so as soon as it lands I can get processing again (when I have time from my other recent career of becoming a Paramedic). Once again appreciate all your thoughts . Regards Dean Wilmot

  8. #8

    Join Date
    Dec 2014
    Location
    Iowa City, Iowa
    Posts
    1,703

    Re: Plumbing for jobo cpp3

    Quote Originally Posted by Dean Wilmot View Post
    Thanks all. I too have a 8 foot darkroom sink and plan to setup the same way. I invested in a HASS TMV 20 years ago and its been in storage and still works so initially was thinking to also run the water in at 20 degrees C but the plumbing and space is bit tight, might need to reconsider this option. In Sydney the water temp gets to 25 degrees in summer so a chiller is also a consideration to plumb in (I used ice blocks when I had the CPE3 and it was a pain in the rear) , yet another expense on an already ridiculously expensive CPP3, UGHH. Is it worth having the TMV set at 20 degrees connected to the solenoid inlet valve on the processor or is it better to use straight cold water ?? I initially thought having the correct 20 degree temp coming in would be ideal?? Ive been told the unit is still 6-8 weeks away but want to make sure all the work is completed so as soon as it lands I can get processing again (when I have time from my other recent career of becoming a Paramedic). Once again appreciate all your thoughts . Regards Dean Wilmot
    I wouldn't Plumb in the processor. As long as your tap water stays below 21-22 °C you can develop black and white fine. The mixing valve is a must (IMHO) for color work. I fill my processor from my mixing valve. If my tap water starts to approach 60°F the mixing valve slows way down. Then I just use the main water faucet wide open, I always fill the unit to the target temperature. The big processors take forever to heat cold water. I put my solutions in a beaker and warm in a microwave, then pour back into the Jobo bottles. I have a dedicated MW in my darkroom, have been using it for 20 years. 6 to 8 weeks, sounds like a luxury voyage. Queen Mary II?

  9. #9
    Daniel Stone's Avatar
    Join Date
    Nov 2009
    Location
    Los Angeles area
    Posts
    2,157

    Re: Plumbing for jobo cpp3

    Freeze a few gallon jugs of water, and pop them in a holding bucket to cool the water down if it is too warm. Most households have a chest freezer in the garage or elsewhere, keep them in there. Small ice blocks ARE a pain in the rear, the larger bottles have more mass, so last longer.

  10. #10
    ic-racer's Avatar
    Join Date
    Feb 2007
    Posts
    6,749

    Re: Plumbing for jobo cpp3

    No special plumbing. I fill it with a hose using tempered water from the control panel. The overflow and spigot have short hoses which drain into the sink. When not in use, the unit is emptied and stored under the counter.

    Click image for larger version. 

Name:	Jobo.jpg 
Views:	36 
Size:	71.8 KB 
ID:	191895

Similar Threads

  1. Jobo CPP3 instructions useless, help needed!
    By Tim V in forum Darkroom: Film, Processing & Printing
    Replies: 6
    Last Post: 23-Jan-2020, 10:27
  2. C41 or E6 in a JOBO CPP2 or CPP3 = Quality?
    By gmfotografie in forum Darkroom: Film, Processing & Printing
    Replies: 19
    Last Post: 1-Dec-2013, 14:01
  3. New Jobo CPP3 lift tested + demo video of the CPP3 in action
    By koh303 in forum Darkroom: Equipment
    Replies: 0
    Last Post: 6-Mar-2013, 11:09
  4. Update from Jobo RE the CPP3 at photokina
    By koh303 in forum Darkroom: Equipment
    Replies: 16
    Last Post: 2-Mar-2013, 21:18
  5. Jobo CPP3
    By mircea nicolae in forum Darkroom: Equipment
    Replies: 6
    Last Post: 10-May-2012, 10:06

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •